Problem 1
 P
Suppose a competitive firm's cost information is as shown in the table below. Its total fixed cost is $9.00.


                          
Output
Marginal Cost
Average Variable Cost
Average Total Cost
0
1$ 8.00$8.00$17.00
27.007.5012.00
36.007.0010.00
45.006.508.75
56.006.408.20
67.006.508.00
78.006.718.00
89.007.008.13
910.007.338.33
1011.007.708.60
  1. Suppose the firm sells its output at a price of $9.10. What is the firm's marginal revenue (MR)?
  2. Compare MR to marginal cost (MC) to determine the firm’s profit maximizing (loss-minimizing) output level. Be sure to check whether or not the firm should shut down.
  3. What is the firm's per-unit profit (loss) at this output level?
  4. What is the firm's total profit (loss) at this output level?
  5. Repeat parts a. through d. assuming the price has fallen to $7.10.
  6. Repeat again assuming the price has fallen to $6.10


Answer:
  1. Marginal revenue is equal to price, or $9.10 in this instance.
  2. The firm will expand production as long as MR exceeds MC and price exceeds average variable cost. It produces 8 units to maximize profits.
  3. Per-unit profit is equal to average revenue, or price, minus average total cost. Per-unit profit = $9.10 – $8.13 = $.97.
  4. Total profit is equal to per unit profit ($.97) times the number sold (8). Profit = $7.76.
  5. MR = price = $7.10. Comparing to MC, the firm produces 6 units. The firm's per unit loss is $7.10 – $8.00 = –$.90. Since this is negative, check to see if price exceeds average variable cost. At 6 units of output, AVC = $6.50, which is indeed less than price, so the firm should produce 6 rather than shut down. The firm's total loss is $.90 x 6 = $5.40. The firm would lose an amount equal to its fixed cost ($9.00) if it were to shut down.
  6. Marginal revenue is $6.10. This is lower than the lowest possible value of average variable cost, so the firm should shut down, losing an amount equal to its fixed cost, or $9.00

Problem 2

A competitive firm's short-run cost information is shown in the table below.
Output
Marginal Cost
Average Variable Cost
Average Total Cost
0
1$ 8.00$8.00$17.00
27.007.5012.00
36.007.0010.00
45.006.508.75
56.006.408.20
67.006.508.00
78.006.718.00
89.007.008.13
910.007.338.33
1011.007.708.60
  1. If the market price is $5.25, how much will this firm produce? Enter in the second column of the table below. Repeat for the remaining prices shown in the table.
  2. Price
    Quantity Supplied, This Firm
    Quantity Supplied, 2000 Firms
    Quantity Demanded
    $5.25


    20,000
    $6.25


    18,000
    $7.25


    16,000
    $8.25


    14,000
    $9.25


    12,000
    $10.25


    10,000
  3. Fill in the next column to determine the market supply in this industry, assuming there are 2000 identical firms in the industry.
  4. Further suppose that the market demand schedule for this industry is given by the last column in the table.
Answer:
  1. At prices below $6.40, the price is less than minimum average variable cost, so the firm shuts down, producing zero. For other prices, the firm produces at the output corresponding to MR = MC. The table is completed below:
    Price
    Quantity Supplied, This Firm
    Quantity Supplied, 2000 Firms
    Quantity Demanded
    $5.250020,000
    $6.250018,000
    $7.25612,00016,000
    $8.25714,00014,000
    $9.25816,00012,000
    $10.25918,00010,000
  2. Each value in the third column is 2000 times the value in the second column: total quantity supplied in the market is equal to the number of firms multiplied by the amount produced by the typical firm.
  3. Equilibrium quantity is 14,000 units, where market quantity demanded equals quantity supplied.
  4. Equilibrium price is $8.25, corresponding to the equilibrium quantity.
  5. At a market price of $8.25, the typical firm produces 7 units. Its revenue is $8.25 x 7 = $57.75. Its total cost is $56, equal to its output times its average total cost: $56 = 7 x $8. Its profit is the difference between total revenue and total cost: profit = $57.75 – $56 = $1.75. Alternatively, its profit is equal to output times the difference between price and average total cost: 7 x ($8.25 – $8.00) = $1.75.

Yorumlar

Bu blogdaki popüler yayınlar

Gelişebileceğinize İnanmanın Gücü – Carol Dweck [TED]

Küçükken derslerden hep en iyi notu almaya çalışanlardım. Bu yüzden de öğrenme sürecini atlayarak, nota odaklanmış oldum ama hırslı, en yüksek notu almak için her türlü yolu deneyenlerden değildim. Sadece en yüksek notu almayınca, kendimi başarısız hissederdim. Üzülürdüm. Aptal hissederdim. Üniversite sınavında da istediğim puanları alamadığım da, ki aslında güzel puan almıştım şu an değerlendirdiğimde, bıraktım. Sonrasında egosu yüksek bir manyakla yılımı geçirdim. Daha da ezikleştim ve kendi kendime yaşayamayacak duruma geldim. Ancak terk edildikten sonra, aslında hayatım biraz daha anlam kazanmaya başladı. Terk edilme sürecimi daha sonra yazacağım. Biraz daha kendime önem verdim, yılalr sonunda değerli olduğumu düşünmeye başladım. Yukarıdaki Carol Dweck'i dinleyince de, gerçekten de sürecin önemini görüyorum. Hata yapmaktan deli gibi korkan ben, kendi hazinelerimi kullanmayı bilememiştir. Çünkü zamanında benim için en iyisi olmayacaksan bir şey olmanın bir anlamı yoktu. Oys...

Hart of Dixie

 Sıcak ve sevgi dolu  Kasaba Dizisi ki ben çok seviyorum kasaba dizilerini.  Konu olarak falan basit ama insanların hikayeleriyle güzelleşiyor.  Saçma yanları da var, sadece enstantane olması için yapılmış bölümler de var ama her şeye rağmen sıcak ve bu beni çok mutlu ediyor.

Fail fast, go forward!

Northern Exposure 6. sezon 18. bölümünde, Ruth Anne kasabayla ilgili ulusal radyoya öyküler yazıyordu. İlk öyküsü çok başarılı oldu, insanların ondan beklentileri arttı ve korkmaya başladı, radyoya çıkmak istemedi. Sonra Ed (Şaman,Yerli,Bilge), kendi yaşadıklarından edindiği dersi anlattı: "That good reviews can be more damaging than bad ones." "Don't take yourself too seriously." "And get your second project done as quickly as possible so you can move on to your third."